RUS/FCS-R、N

RUS/FCS-R、N
RUS/FCS-R、N

Detailed

Network optimization materials: RUS/ fcs-r, N

[0003] the purpose of the utility model is to overcome the deficiency of the existing technology and provide a metal hose joint with quick, convenient connection and reliable connection.

[0004] to achieve the above purpose, hydraulic transition fittings factory technical scheme provided by the utility model is: a kind of metal hose connector, including joint ontology, under the joint end of ontology in the inner chamber clamping pieces, used for locking in the metal hose connector body side of the lock set and set in the sealing ring on the connector at the other end of ontology and the lock pieces of non-standard stainless steel Y type tee, also includes nested clamping piece described in external set of rubber seal, described a good card on the outer end face forming a mesh with the inner wall of the metal hose thread connection thread, which described when the metal hose and clamping after putting in place a threaded connection,The locking sleeve passes the rubber sealing sleeve to the metal hose

Locking on the body of the joint: the straight through transition joint manufacturer can make the metal hose connect with the body of the joint quickly through its own thread when installing by setting the connection thread on the outer end face of the clamp. The whole process is simple, fast and reliable.In addition, the rubber sealing sleeve can further ensure the connection of the metal hose is reliable and tight.

[0005] further, non-standard stainless steel tee tee joint described include nested in ontology at the other end in the inner chamber composed of rubber abrasion resistant material ring bushing; through at the end of a joint body inner cavity Settings are made of rubber abrasion resistant materials in the annular sleeve, can the normal use of sub ontology, can effectively reduce the wall thickness, and reduce the production cost.

[0006] compared with the existing technology, this scheme has simple structure, quick and convenient connection and reliable installation connection, greatly reducing the difficulty of installation and operation for workers.

The appended drawings show

Figure 1 is the existing three-dimensional structure diagram of metal hose joints.

Figure 2 is a schematic diagram of the existing metal hose installation, transfer and decomposition structure.

Figure 3 is the three-dimensional structure diagram of the metal hose joint in the utility model.

Figure 4 is a schematic diagram of the decomposition structure of metal hose installation, transfer and distribution in the utility model.

[0011] figure :100 a metal hose joint, 1 a joint body, 2 a sealing ring, 3 a locking piece, 4 a clamping piece, 401 a piece

Thread connection, 5 rubber seal sleeve, 6 lock sleeve, 7 ring bushing.

RUS/FCS-R、N



分享到